14.03.2003 - In February 1999 MAN Turbo received an order from the City of Chalon for installation and commissioning of a 25 MW gas turbine. The FT8-30 PowerPac drives a generator and is equiped with a downstream waste heat recovery boiler. The district station is successful in operation since 2000.